Check for interrupt before initializing the _tenantOplogApplier

XMLWordPrintableJSON

    • Fully Compatible
    • ALL
    • v4.9
    • Repl 2021-05-17
    • 47
    • None
    • 3
    • None
    • None
    • None
    • None
    • None
    • None

      _interrupt calls _cancelRemainingWork which would cancel the _tenantOplogApplier if it exists. But I think it is possible for the _tenantOplogApplier to be initialized after _cancelRemainingWork is called. In that case, the _tenantOplogApplier would never be shut down. I think we should check for interrupt before initializing the _tenantOplogApplier.

            Assignee:
            Lingzhi Deng
            Reporter:
            Lingzhi Deng
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: