-
Type: Task
-
Resolution: Unresolved
-
Priority: Major - P3
-
None
-
Affects Version/s: None
-
Component/s: Not Applicable
-
Storage Engines
-
5
There are several manual steps in defining a new control point. Some can be automated by a script. See "Flow to Create a Control Point" in the design doc.
This is one of the main things needed to make the POC easier to use thus changing it from a POC to a MVP.
Note, the control points implementation tickets are in three time periods:
- POC - Part of the POC.
- MVP - Part of the minimal viable product. However, even the POC can be used but less conveniently than the MVP.
- Future - Enhancements after the MVP.
The title of each ticket starts with the time period.
- is depended on by
-
WT-13586 MVP: Full control points test suite
- Backlog