Uploaded image for project: 'WiredTiger'
  1. WiredTiger
  2. WT-8321

Update timeout for smoke tests to 60 minutes

    • Type: Icon: Build Failure Build Failure
    • Resolution: Fixed
    • Priority: Icon: Major - P3 Major - P3
    • WT10.0.1, 5.2.0, 5.0.5
    • Affects Version/s: None
    • Component/s: None

      The following run of format-stress-smoke-test timed out on a PPC:

      https://evergreen.mongodb.com/task/wiredtiger_ubuntu1804_ppc_format_stress_smoke_test_2_6ddfc52f11222bcd47518fce6b5ed458075f9c31_21_11_01_04_37_13

      The test runs batches of 8 format jobs. It appears the number and duration of runs doesn't match the timeout for the task.  The tests were aborted and the hang-analyzer ran on 8 different format jobs.  A brief survey of the stacks looks like they were all making progress when the test timed out. We should either change the timeout or the number of runs so that this doesn't happen.

            Assignee:
            keith.smith@mongodb.com Keith Smith
            Reporter:
            xgen-evg-user Xgen-Evergreen-User
            Votes:
            0 Vote for this issue
            Watchers:
            4 Start watching this issue

              Created:
              Updated:
              Resolved: